Finding Your Pain

Diagnosing the symptoms and discovering the root cause is challenging, however the rewards are well worth the journey.

We all experience pain – Whether you’re feeling Chronic pain or Breakthrough pain with your PCB Assemblies and Box Builds business partner, it should not be overlooked.  Sometimes the most difficult task is finding the source of your pain and working through it.

 

 

THE SYMPTOMS – What you may be experiencing with your Electronics Manufacturing Services Supplier.

• Missed Delivery Dates

• Unacceptable defect rate

• Unsatisfactory Customer Experience

• Lack of Engineering Support

• Service and Warranty Management issues

• Lack of Flexibility to meet your needs

THE ROOT CAUSE – Finding the source of your Pain with your PCB or Box Build Assembly Supplier.

These are some of the things that we have uncovered that may be the source of your pain:
• Contract Manufacturers who lack experience in managing a Complex Global Supply-Chain.
• Older technology that is not able to handle the demand for smaller, more densely populated assemblies.
• Inability to provide Product Life Cycle Management Services to identify obsolete components.
• Capability does not include box builds that arrive to you tested and ready to install.
• Your Electromechanical Assembly Manufacturer is not the “right size” to quickly adjust to your production needs.  Too large and they can’t adjust – too small and they don’t have the equipment to remain competitive and ensure quality. 
• Does your Customer Service Representative understand and respond to your needs?
• Are they at the forefront of manufacturing innovation?
• Do they have a clear engineering vision as part of their core values?

THE CURE – What to look for in a Contract Manufacturer

  • • Make sure your CM provides an Engineering review of your PCB Assembly and Box Builds – making suggestions that will enhance your assembly layout, keeping cost and functionality in mind.
  • • A business partner that can provided Prototyping as a part of your new designs prior to product launch.
  • • Look for an onsite lab for testing and unique test fixture development.
  • • Have thorough product inspection controls throughout the entire manufacturing process.
  • • Experienced in Logistics and Supply Chain Management with tight inventory management controls and LEAN culture.
  • • Make sure they are a resource that is “right sized” so they can handle large and small quantities in-plant.
  • • Provide a dedicated Customer Service Contact to manage your account from quote, through production, and including final receipt.

THE UPSIDE – How your company will benefit from a solid partnership

With strategic outsourcing you can align yourself with a CM that can diagnose your pain and prescribe the perfect solution.  This will allow you to focus on your core business.  Altek is not complacent with the status quo.  We continually review our process and embrace LEAN as a part of our culture. 

Our Quality Policy – “Altek is committed to providing customer satisfaction through open communications and continuous improvement”   

Please let us know if we can cure your pain!

Contact our team @ info@altekelectronics.com

www.altekelectronics.com

Ever Changing State of Design – Design for Availability

Design for Manufacture has taken on a whole new direction. Keeping up with how the industry is changing and what you can do about it.

Design for Manufacture has taken on a whole new direction.  It used to be enough to consider component spacing, orientation, and electronic compatibility.  The number of components used in electronic products today has increased significantly, therefore putting a strain on the availability of components in the market place. 

MOORE’S LAW

Gordon Moore, Co-Founder of Intel authored Moore’s Law in 1965 – Moore states that the number of components able to fit on a single IC will double every year.  In 1985 Moore tweaked his projection to read “doubling every 2 years”.  This has continued to hold true for over 30 years.  Some say this is coming to an end as components will only get so small; however, the demand for new electronic devices continues to rise adding to the strain on the component supply.   The incredible increase in usage – demand outpacing supply, sourcing of raw materials, dealing with trade agreements and tariffs are lengthening our lead times considerably. 

A GAME CHANGER

These days the strained availability of components make it a whole new game.  Component size has decreased significantly allowing many more parts to be placed within the footprint of today’s smaller electronic devices.  The concept of Design for Manufacturability is joined by the necessity of Design for Availability.

Everyone can relate to the general consumer example of the cell phone.  Using today’s smaller component package size, mobile devices have decreased in size with a significant increase in functionality.  The capability of today’s integrated circuits turns cell phones into mini-computers with email, camera, video, internet access and thousands of apps making today’s product much different than Motorolas’ DynaTAC launched commerically in 1984 with 30 minutes of talk time.  This remarkable evolution is also evident in many other products including automobiles, medical devices, commercial and industrial equipment, consumer devices and aerospace applications.

Fun Fact:
1983 – Motorola Dynatac 8000X weighed – 1.75 pounds and was 13″ x 1.75″ x 3.5″.
2018 – iPhone XS Max weighs 7.34 oz and is 3″ x 6.25″ x .33″.

WHAT YOU CAN DO

Design Engineers many not have control over the component market, but there are some things we can do to avoid shutting down assembly lines.

•  Use smaller packages where possible.  For example, replace 1206 and 0805 chip caps and resistors with 0603, 0402, and 0201.

•  Verify that specified parts have an active lifecycle status (instead of Not Recommended for New Design, End of Life, etc.).

•  Spec at least 3 alternates for each item on the BOM, with a different manufacturer for each.

•  Use the lowest rating and widest tolerance range your design can handle. If these parts become unavailable, the same part with a tighter tolerance or higher rating may still be available.

TEAM UP WITH YOUR CM

We’re here to be a part of your solutions team.   Getting your CM involved early in the process will add significant value and eliminate build delays.  Altek can often assist with recommendations for alternates or suggest custom solutions.  We will identify and can handle advance ordering on long lead items. Our excellent relationships with our distributors give us an edge in meeting your needs.

THE MORAL OF THE STORY

As Ben Franklin said in 1736 “An ounce of prevention is worth a pound of cure”.  This still holds true today.  Design for Availability activities will mitigate lead times and get your product to market on time.

Students, Manufacturers Meet To Fill Connecticut Aerospace Jobs

What a great day yesterday! The morning spent educating high school students on careers in manufacturing and the afternoon chatting with Aerospace professionals.

What a great day yesterday!  The morning spent educating high school students on careers in manufacturing and the afternoon chatting with Aerospace professionals.

Click to read the full article as it appeared in the Hartford Courant – by Stephen Singer

New England Expo and & Tech Forum – Worcester MA

Local Expos and Tech Forums have become one of the great benefits of SMTA’s local chapters. Attendees get valuable technical info, meet leading suppliers

New England Expo and & Tech Forum to be held in Worcester MA.

Wednesday, September 12, 2018.

Local Expos and Tech Forums have become one of the great benefits of SMTA’s local chapters. Attendees get valuable technical info, meet leading suppliers, and get a FREE lunch. Exhibitors get a great opportunity to connect with people in their region who want to know about their products and services.

Click here to find out more information and to register!

SMTA-CT Tech Session: Tour of Altek Electronics Inc. & presentation of LEAN initiatives

Attendees will see examples on both the manufacturing floor as well as administrative functions where teams are improving safety and efficiency through formal workplace organization

Attendees will see examples on both the manufacturing floor as well as administrative functions where teams are improving safety and efficiency through formal workplace organization, identifying waste through process mapping, improving communication through visual management, improving flow through kaizen, reducing set up times through set up reduction activities, and addressing gaps through root cause problem-solving.

Agenda:  8:30 a.m. Registration, networking and continental breakfast

9:00 a.m.  Presentation on LEAN/Continuous Improvement at Altek

9:45 a.m.  Factory Tour – examples of LEAN and Continuous Improvement initiatives

11:00 a.m. Depart

Price:     SMTA member: $25   Non-member: $35

5th District candidate Glassman’s Torrington visit focuses on job creation

TORRINGTON — Made in Connecticut was the theme on Wednesday when 5th District Democratic candidate Mary Glassman toured Altek Electronics Inc. at 89 Commercial Blvd.

“I want to help facilitate new jobs,” Glassman said during the tour.

She noted that 13,000 jobs in Connecticut go unfilled because potential workers do not have the skills required for manufacturing jobs.

“There are good jobs, good pay and good futures,” in industry, Glassman said.

She pointed to a a success story from Torrington High School’s Innovation Class, which collaborates with Northwestern Connecticut Community College. Through the program, Altek employee Alain Malcom learned the skill of soldering and was hired two years ago. The 20-year-old now works as a junior buyer.

That type of collaboration could boost the economic health of the 41 towns within the sprawling 5th district.

“I know how cities make decisions,” said Glassman, who served as Simsbury’s first selectwoman for 16 years. “We can leverage state and local government.”

Ravi Kailan, director of operations for Altek, said the company grew by 15 percent about a year ago. Through the application of lean engineering, which practitioners use to pinpoint more effective manufacturing processes, Kailan said Altek was able to recoup the cost of a $365,000 machine in less than two years.

Luciana Rodriguez, a trainer for the surface mount team, said she’s learned how to help her team be more efficient.

“What used to take two days now takes less than a day,” she said.

That result allows the company to grow its business, Kailan added.

Altek, a family-owned company with almost 200 employees, opened in 1972. Sabrina Beck, vice president and co-owner of the company, said Mexico and China are their biggest competitors. “We are constantly asked to reduce prices,” she said.

“I want to keep the cost of working in Connecticut down,” Glassman responded.

Glassman’s Democrat opponent for the 5th District seat is Jahana Hayes, of Wolcott. She is a Waterbury teacher who was named national teacher of the year in 2016.

They will face off in the primary election on Aug. 14.

Read full story in The Register Citizen

Altek Electronics Partners with ERSA to Continue Providing Customers with Quality Products On-Time and Cost Effectively

A veteran-owned small business privately held by three family members (Stephan Altschuler, David Altschuler, and Sabrina Altschuler Beck), Altek Electronics, Inc. manufacturers printed circuit board assemblies and box builds for many industries including medical, military, industrial and telecommunications.

Click to read the full article.

Electronics Firm Builds Relationships While Assembling Boards

When Altek Electronics Inc. CEO David Altschuler talks about understanding the company’s customers, he means he visits the customer’s plant once a week, walks through security wearing the badge they gave him 18 years ago, and he talks to various people in the receiving department, production, engineering, and supply chain about what they need and how Altek is performing.

Click to read the full article